Vesgantti King Mattress 12 Inch - King Size Mattress Medium Plush Hybrid with Multi-Layer Thick Top, Motion Isolation Pocket Springs for Side Sleepers, Back Pain Relief, CertiPUR-US

★★★★★ 4.2 107 reviews

US$92.00
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.tdmglass.com.au
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$92.00
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Jun 2
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.tdmglass.com.au
Free 30-day returns Details

Product details

Management number 220961479 Release Date 2026/05/03 List Price US$92.00 Model Number 220961479
Category
  • Balanced Medium Plush: This king size mattress features an upgraded 3" high-loft top for deeper pressure relief. This specialized "sink-in" zone tailored for side-sleeper comfort cradles shoulders and hips, effectively neutralizing the localized pressure points that cause discomfort on standard surfaces
  • Sag-Resistant & Spine Alignment: Our 12-inch king mattress utilizes 15% denser transition foam to ensure superior contouring. Unlike ordinary foams that sag, this high-density core provides an active upward rebound to fill the waist gap, maintaining a neutral posture without the "sinking feeling
  • Multi-Zone Ergonomic Support: Featuring an increased coil count for lasting bounce and sensitive feedback. This high-resilience design allows heavy areas to sink naturally to prevent numbness, while providing a flexible push-back to fill the waist gap, ensuring proper spinal alignment in any position
  • Zero Motion Transfer: Experience undisturbed sleep with independently wrapped pocket coils that isolate movement. This hybrid design adapts to your unique body curves, promoting deep muscle recovery and ensuring you won't feel your partner’s movements throughout the night
  • Certified Safety & Peace of Mind: 100% fiberglass-free and CertiPUR-US certified for a non-toxic sleep environment. Shipped as a "mattress in a box" for easy setup, it includes a 120-night risk-free trial and a 10-year warranty for your total peace of mind

Size King
Color Blue
Portable No
topstyle 3-inch Ultra-Thick Euro Top
Brand Name Vesgantti
Item Depth 12 inches
Model Name King Mattress 12 Inch
Style Name 12 IN
Is Foldable No
Item Weight 102.8 Pounds
Manufacturer Vesgantti
Model Number JJD306LA12K
Fill Material Memory Foam
Material Type Memory Foam, Spring
Mattress Type Standard Mattress
Cover Material Polyester
Item Thickness 12 Inches
Item Type Name Bed Mattress Conventional
Is Customizable No
Item Dimensions 78.01 x 11.03 x 12 inches
Number of Layers 8
Product Benefits 15% Higher Density Foam, 3-inch Ultra-Thick Euro Top, Back Pain Relief, Improves Sleep, Motion Isolation, Thickened Individual Springs
Construction Type Hybrid
Mattress Coil Type Pocketed Coil
Additional Features Back Pain Relief, Breathable, Motion Isolation, Pressure Relief, Spinal Alignment
Included Components King mattress
Age Range Description Adult
Weight Capacity Maximum 500 Pounds
Manufacturer Part Number ET3
Number of Mattress Coils 800
Item Firmness Description Medium Plush
Product Care Instructions Fiberglass Free, Hand Wash Only
Mattress Comfort Layer Material Memory foam
Item Dimensions L x W x Thickness 80"L x 76"W x 12"Th
Global Trade Identification Number 00840452663916

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.2 out of 5
★★★★★
107 ratings | 44 reviews
How item rating is calculated
View all reviews
5 stars
78% (83)
4 stars
6% (6)
3 stars
3% (3)
2 stars
2% (2)
1 star
11% (12)
Sort by

There are currently no written reviews for this product.